中文字幕一区二区在线播放_中文字幕一区二区精品区_中文字幕在线看无码a_中文字幕在线观看91_中文字幕永久免费_无码视频一夜夜嗨_无码任你躁久久久久久老妇91

Language:CHINESESENGLISH

Home > News > Steel and steel component assembly installation requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://jbpfund.com

Steel and steel component assembly installation requirements

Time:[2014-7-12]  Hits:5507

Steel and steel components assembled device requirements:
Foshan welded H-beam steel flange plates and webs seam seam spacing should not be less than 200mm.
Flange plate splice length should be less than 2 times the plate width. Web splice width should not be less than 300mm, the length should not be less than 600mm.
Cranes and crane girder truss system in place should not be under the scratch.
When multi-section column device, the positioning of the axis of each section of the column axis manipulation should lead directly on the ground, can not lead from the axis of the lower column, to avoid the formation of excessive accumulation errors.
After the completion of the steel truss structure and overall fight should leave after completion of the roof measuring its deflection, deflection and the measured value should not exceed 1.15 times the corresponding planning values.
Remember:
Paint, painting several times, coating thickness should fit planning requirements.
When planning for the coating thickness is not required, the total thickness of the coating: Outdoor should be 150μm, interior should be 125μm, the allowable deviation for each pass coating thickness of 25μm tolerance for 5μm..
Thin coating fireproof paint coating thickness should fit the planning requirements for fire resistance. Thick coating fireproof paint coating degrees, more than 80% of the area should be consistent with the relevant planning and fire resistance requirements, and should not be less than the thickness of the thinnest planning 85%.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
昌都县| 忻城县| 绥芬河市| 浦北县| 钦州市| 西乡县| 周口市| 榆树市| 建平县| 正安县| 东兰县| 平潭县| 井冈山市| 玉山县| 合肥市| 余干县| 呼伦贝尔市| 土默特右旗| 息烽县| 和林格尔县| 惠来县| 左贡县| 普兰店市| 肇州县| 吴江市| 台东市| 双桥区| 潢川县| 右玉县| 黄山市| 视频| 治多县| 滦平县| 梧州市| 剑河县| 威远县| 金塔县| 南平市| 谷城县| 称多县| 南皮县|