中文字幕一区二区在线播放_中文字幕一区二区精品区_中文字幕在线看无码a_中文字幕在线观看91_中文字幕永久免费_无码视频一夜夜嗨_无码任你躁久久久久久老妇91

Language:CHINESESENGLISH

Home > News > How to ensure the completion of steel structure project on time
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://jbpfund.com

How to ensure the completion of steel structure project on time

Time:[2016-11-9]  Hits:4963

   The construction of a steel structure, completed within the specified period is a commitment to the enterprise, but to ensure the completion of this task, it must not be a good commander. So today by the Guangzhou Steel Company commander to share with you more.
       1, in the construction of the total duration as the goal to stage control plan to ensure the use of effective internal and external conditions for enterprises to take dynamic management to make the construction of a scientific and rational organization to ensure that the plan on schedule or ahead of schedule.
        2, fully prepared before the start of the preparatory work.
        3, conscientiously do a good job in the drawings of the trial work will be found in the technical settlement to resolve, to avoid the construction due to design changes and delay the construction period, the timely preparation of practical construction design and construction of major sub-project construction design for continuous construction operations to provide reliable guarantee .
        4, daily production scheduling meeting, daily inspection, if any delay by increasing labor force measures in time to solve the human, machinery, material supply and other problems timely coordination by the company to solve.
       5, the last is the most important, internal and external communication and coordination.
      How to ensure that steel works completed on schedule, the above is given today to share. Want to learn more, Shengbang Guangzhou Steel Structure Company welcomes you!
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
太仓市| 固阳县| 故城县| 昆山市| 宝兴县| 金阳县| 新乐市| 绥化市| 岳西县| 山阳县| 东兴市| 潮安县| 五华县| 尚义县| 九江市| 海门市| 曲水县| 宁国市| 搜索| 东兴市| 四会市| 健康| 安陆市| 明星| 瑞金市| 岐山县| 鄂尔多斯市| 察隅县| 庆安县| 五寨县| 舒城县| 伊春市| 满城县| 河池市| 乡宁县| 湄潭县| 宿松县| 桑日县| 宁海县| 腾冲县| 宣恩县|