中文字幕一区二区在线播放_中文字幕一区二区精品区_中文字幕在线看无码a_中文字幕在线观看91_中文字幕永久免费_无码视频一夜夜嗨_无码任你躁久久久久久老妇91

Language:CHINESESENGLISH

Homepage > Product > Green Steel structure Warehouse
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://jbpfund.com

Green Steel structure Warehouse

Green Steel structure Warehouse

 

 

Prefabricated steel structure warehouse

1.Engineering cases:

 

 

2.The detail material for the steel structure:

The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .

3.Commonly used steel materials and the performance of the steel:

1) carbon structural steel: Q235B, Q345B, etc.

2) high strength low alloy structural steel;

3) high quality carbon structural steel;

4) alloy structural steel special steel;

5) special purpose steel;

6) walls and roofing material is optional: corrugated steel plate, EPS sandwich panel, rock wool sandwich panel and polyurethane sandwich panel

 

4.Guidance installation

  Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2) All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:

 

Contact way

1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

 

Hits:13530 Time:[2024-11-23]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
克东县| 长治市| 甘泉县| 丹寨县| 康乐县| 工布江达县| 池州市| 永善县| 镶黄旗| 铅山县| 甘孜县| 鞍山市| 保山市| 安陆市| 江阴市| 崇义县| 漳州市| 明星| 西乌珠穆沁旗| 吕梁市| 西充县| 开封市| 锡林郭勒盟| 凤台县| 冷水江市| 叶城县| 湖北省| 维西| 安陆市| 柳江县| 瑞金市| 文化| 芦山县| 绥芬河市| 乌兰浩特市| 林芝县| 惠州市| 航空| 奉化市| 鹰潭市| 衡阳市|